 our team spirit is to explore spatial design possibilities.

 "SPIRIT to EXPLORE"

Arrow_White.gif

Timeline?
Budget?

Photo/Video
Keep Wall?

Address
Existing Plan

Whatsapp_W_edited.png

WhatsApp (+852 5495 9545) 

Please whatsapp us to provide basic information, including address, floor plan, photos or videos, and project expectations such as budget and timeline.

We will reply within 24 hours with a meeting and preliminary concept quotation.

Arrow_White.gif

Sketch /

3D Model

Furniture Schedule
(HK Supplier)

Space Planning
Layout

Style & Materials
Colors

Client Needs
Site Condition

Tender  Drawings
e.g. E&M / Light Plan

Lighting Schedule
(HK Supplier)

Sanitary Schedule
(Kitchen & Bath)

Design Concept Development (2-4weeks):
Based on the client’s lifestyle and the existing space layout, we will plan the overall floor layout and circulation. At the same time, we will confirm the overall design style and select the main materials and color direction.

 

Moreover, Hand sketching or a 360-degree 3D modeling in computer will be created to present the spatial proportions and atmosphere, allowing clients to understand the space, functions, and material effects from different perspectives.

Design Detail Development (2-4weeks):
Based on the approved concept, we will prepare a full set of tender or construction drawings. These include electrical plans, lighting plans, elevations, furniture drawings, and etc to ensure accurate construction. Moreover, 
A Procurement List will also be prepared for items such as lighting, loose furniture, kitchen and bathroom fixtures.

Arrow_White.gif

PHASE

Site Check

PHASE

Plaster & Paint

PHASE

Demo

-lition

New Walls

E&M

Water

-proof

Site Check

PHASE

Tiling

E&M Install

Carpentry

Factory Product

(min. 3 weeks)

Factory

Drawing

Confirm

Measure

Warranty

Install Cabinet

Cabinet Delivery

Touch-up

Cleaning

Final Check

Phase 1 – Basic Works (3–6 weeks):

Demolish existing interiors, build or modify walls according to the drawings, and complete plumbing and electrical works, including wiring, water supply, and drainage. After the first client inspection, carry out plastering and waterproofing, followed by a second inspection.

Phase 2 – Finishes & Furniture Ordering (3–6 weeks):

Install floor tiles, prepare the paint base, and complete site carpentry such as false ceilings, partitions, and door frame bases. Then apply wall skimming and the first coat of paint.
Site measurements for custom furniture will be taken after tiling, drawings confirmed with the client, and factory production started, which takes at least three weeks.

Phase 3 – Furniture Installation (3–4 weeks):

Once custom furniture is delivered, installation begins, followed by electrical and plumbing fixtures such as lights, switches, toilets, faucets, and shower sets.
Finally, Stone countertops and kitchen appliances will also be installed by other suppliers.

Phase 4 – Project Handover (1–2 weeks):

Complete final paint touch-ups, apply the last coat, and carry out basic cleaning. Then conduct a final inspection with the client, review the works, and explain the one-year maintenance service.

Location_W.gif

RM813, The icon,

Kwun Tong Rd320, H.K.

Whatsapp_W.gif

+852 5368 0943

(24/7 Whatsapp)

Instagram_W.gif

Spirit_Spatial_Studio

Facebook_W.gif

Spirit Spatial Studio

info@SpiritSpatial.Studio

Email_W.gif

© 2026 SPIRIT SPATIAL STUDIO ALL RIGHTS RESERVED

bottom of page